SYSTEM THROUGHPUT (M1+M2+M3+Goodman+CCD)

 

     This figure (measured by Luciano Fraga) shows full system throughput before (dotted lines) and after (solid lines) the Feburary 2011 servicing run.  The 600 and 2100 line gratings were measured.